High-Capacity Networks for
Full-Field Connectivity

Case #1

  • Fiber infrastructure was unavailable in this near-metro area.
  • The GC had been leveraging cellular service with low capacity and excessive overage charges.
  • Project campus spanned nearly 1 mile with two separate clusters of job trailers that needed to be networked together.

Case #2

  • Project owner mandated network and Wi-Fi accessibility to all subcontractors on the job.

  • GC planned to deploy DEWALT jobsite access points, but was losing significant bandwidth toward the edge of the mesh network.

Download the full case study to see how CCR tackled these challenges (and more) for our clients.