High-Capacity Networks for
Full-Field Connectivity
Case #1
- Fiber infrastructure was unavailable in this near-metro area.
- The GC had been leveraging cellular service with low capacity and excessive overage charges.
- Project campus spanned nearly 1 mile with two separate clusters of job trailers that needed to be networked together.
Case #2
-
Project owner mandated network and Wi-Fi accessibility to all subcontractors on the job.
-
GC planned to deploy DEWALT jobsite access points, but was losing significant bandwidth toward the edge of the mesh network.